Step 1 of 7 · Getting Started

Free Bid Proposal Template

Your answers save as you go. Legal form tools, not legal advice.

Free template

Download a free business proposal template

Free blank form—no account or payment required. The PDF is printable and the Word file is editable. This general version does not include state-specific clauses or disclosures.

Build a guided state-specific version
BusinessLast updated November 23, 20265 min read

What is a bid proposal?

A bid proposal is the price a contractor offers for a defined piece of work, usually in answer to an owner's or general contractor's request. Unlike a general sales proposal, a bid is tied to a set of documents: the drawings, specifications and addenda that describe the job. The owner compares bids line by line, so a clear bid states exactly what was priced and what was not.

When you choose Bid in the builder, the proposal changes in several ways. You become the "Bidder". A section called The Project adds the project description, the site address and a list of the Bid Documents your price is based on. Your approach replaces the general solution section. The pricing section becomes the Base Bid, with a line-item table and a base bid total. You can add up to three alternates, any allowances, and the bid security or insurance you will provide.

When to use one

  • A roofing, electrical, plumbing or general contractor bidding on a private project
  • A subcontractor pricing its trade for a general contractor
  • A contractor pricing a renovation for a property manager or homeowners association
  • A service company bidding a fixed-scope job such as paving, painting or landscaping

What it should include

  • The project: a short description, the site address and any bid request number.
  • Bid documents: every drawing set, specification and addendum you priced, with dates.
  • Base bid: the line items, quantities, unit prices and the base bid total.
  • Alternates: each optional change with the amount to add or deduct.
  • Allowances: amounts included for items still to be chosen, adjusted later by change order.
  • Payment terms: progress billing, a deposit, payment on completion or your own schedule.
  • Exclusions and assumptions: work you did not price, such as permits or hazardous material removal.
  • Acceptance: the valid-until date, your withdrawal choice and signature lines for both sides.

Bonds, public bids and signatures

Public construction is governed by the bid request and the owner's procurement law, not by your bid form. For federal construction, alteration or repair contracts above a set amount, 40 U.S.C. § 3131 requires the contractor to furnish a performance bond and a payment bond before the contract is awarded. States and cities have their own bond and bidding rules. Our bid never claims to meet any of them; it prints only what you enter. Both sides can sign electronically, and under 15 U.S.C. § 7001 a contract may not be denied legal effect solely because an electronic signature was used to form it.

Follow the bid request first

If you are answering a formal invitation to bid, use the forms and follow the instructions it requires, and make sure this proposal does not contradict them. LawVault is a document service, not a law firm, and this page is general information rather than legal advice.

How to create your bid proposal

The builder opens with Bid already selected, so the questions go straight to the parties and the project.

  1. Choose the statePick the state whose law governs the bid and any agreement formed by accepting it.
  2. Enter the partiesAdd your company, the person signing the bid, and the owner or general contractor receiving it.
  3. Describe the projectAdd the title, dates, site address, any bid request number and the bid documents you priced.
  4. Build the base bidEnter up to six line items and the builder totals them. Add alternates, allowances and any bid security.
  5. Set payment and exclusionsChoose progress billing or another payment method, list exclusions and assumptions, and decide whether to hold the bid open.
  6. Review and signDownload the bid as a PDF or Word file, sign it and send it before the deadline.

For services, products or partnerships, start from the main business proposal. Once a bid is accepted, a fuller construction contract can set out the building terms, and a service agreement suits non-construction work.

Common questions

It is a contractor's written offer to perform a defined job for a stated price. It names the project, lists the plans, specifications and addenda the price is based on, sets out the base bid, and usually offers alternates the owner can accept or decline. Ours ends with an acceptance block, so the bid becomes a binding agreement once both sides sign it.

The base bid is the price for the work shown in the bid documents. An alternate is an optional change the client can accept in writing, priced as an amount to add to or deduct from the base bid. An allowance is a set amount included in the base bid for an item not yet fully defined, such as fixtures to be chosen later; our bid says the price is adjusted by the difference in a written change order once the actual cost is known.

Yes. Enter up to six line items with a quantity and a unit price, such as square feet of roofing or a lump sum for mobilization. The builder works out each amount and prints the base bid total. If any line has no price yet, the total stays blank.

Only alongside the forms the request requires. Public owners usually prescribe their own bid form, addenda acknowledgments, bid security and other documents, and their procurement rules control. Federal construction contracts above a set amount also require performance and payment bonds under the Miller Act, 40 U.S.C. § 3131. Use this bid as a cover letter or price breakdown only if the request allows it.

Under our template you choose. By default you may withdraw or change the bid by written notice before the client signs it. You can instead promise to hold it open until the valid-until date. A public bid request may set its own withdrawal rules, and those apply to bids submitted under it.

Only if you will provide one. The builder has an optional field that prints exactly what you type, such as a bid bond for a stated percentage of the base bid or a certificate of insurance enclosed with the bid. Leave it blank and nothing about bonds or insurance appears.

Still unsure? Visit the help center.

Ways to get your business proposal

Answer the questions and preview the finished document free. You pay only when you’re ready to download, print or e-sign it, and you can choose how.

Free 7-day trial subscription Cancel anytime

$49/mo $0 for one week

Unlimited access to 260+ legal documents for 7 days. After the trial it renews at $49 a month unless you cancel at least 24 hours before it ends.

Start 7-day trial

Pro, billed yearly

$9.99/moBest value · Save 80%

Unlimited documents and edits, e-signature for every party, and the freedom to amend and re-issue at any time. Billed $119.88 a year and renews annually. Cancel anytime.

Start annual plan

Single document

$39One-time, no renewal

Unlock just this business proposal: a permanent PDF download, printing, e-signature for every party and a tamper-evident audit trail, with no subscription.

Build this document

Prices in USD. Free blank templates stay free. Compare plans or read the refund policy.

Build your business proposal in minutes

Preview the document your answers produce — then review, e-sign, or download it.

State-specific · E-sign ready · Legal form tools, not legal advice