What is a cell tower lease?
A cell tower lease is an agreement between a property owner and a wireless carrier or tower company. The owner rents out a small piece of the property, often a fenced square of land, part of a roof, a spot on an existing tower or space on a water tank. The tenant installs antennas, cables and equipment cabinets and pays rent for years, sometimes decades.
Because the tenant drafts most of these leases, the first offer usually favors the tenant: automatic renewals, broad rights to end the lease, free assignment, and a right of first refusal over the owner’s property. A landowner who starts from a balanced form can see what each term does before agreeing to it.
The LawVault builder writes a cell tower lease for the kind of site you have. It sets out the leased space and the easements, the term and renewal schedule, the rent and how it grows, who may share the site, how the tenant leaves at the end, and a one-page memorandum of lease for recording.
- Free blank cell tower lease template as a printable PDF and an editable Word file
- Four site types: a new tower on raw land, a rooftop, space on your existing tower, or a water tank or other structure
- Access and utility easements, access hours and an optional backup generator
- Initial term with up to five renewal terms, laid out in a term schedule table
- Rent increases by a fixed percentage, by CPI with an optional cap, or at each renewal
- Co-location terms with an optional revenue share and an exclusivity choice
- Tenant termination rights, a removal deadline and an optional removal bond
- A Memorandum of Lease with a notary certificate for each signer, plus a separate signing guide
Types of cell site leases
The site decides much of the lease: who owns the structure, who maintains it, and what has to come out at the end.
Raw land (ground lease)
The tenant builds its own tower and fenced compound on a parcel of your land and owns the tower until it removes it. Tower companies often add other carriers to it.
CreateRooftop
Antennas go on the roof of your building and equipment cabinets on the roof or inside. Structural review, roof protection and building access rules matter most.
CreateSpace on your existing tower
You own the tower and lease antenna space on it plus ground space for equipment. You keep the right to lease other tower space to other carriers.
CreateWater tank or other structure
Antennas mount on a water tank, silo, steeple or similar structure. The structure’s main use comes first, and the tenant works around its maintenance.
CreateIf a tenant will put up its own building on your land for a long term, use a ground lease agreement. For farming, grazing, hunting or storage, use a land lease agreement.
When to use a cell tower lease
Use a cell tower lease when a carrier, a tower company or a site acquisition agent asks to put wireless equipment on your property. Common situations include:
- A new tower on rural or suburban land: the tenant wants a fenced compound and an access road.
- A rooftop site: an apartment, office or church building is tall enough to carry antennas.
- Adding a carrier to your tower: you own a tower and a second carrier wants space on it.
- A municipal or private water tank: antennas mount on the tank with cabinets at its base.
Before you sign, check your own mortgage, any association rules and other leases on the property, and ask the tenant for its site plan and equipment list.
What a cell tower lease should include
A cell tower lease can bind your property for decades, so the details matter more than in most leases:
- Parties and property: legal names, mailing addresses, the property address, parcel number and legal description.
- Premises and easements: the exact leased space, the access route and hours, and the utility route.
- Facility: what the tenant may install, height limits, and what happens before more weight goes on a structure.
- Term and renewals: the commencement date, the initial term, the number and length of renewal terms, and how each one starts.
- Rent: the starting rent, when it is due, how it increases, and any share of rent from other carriers.
- Interference and exclusivity: whose equipment has priority and whether you may lease to other carriers.
- Termination and removal: when the tenant may leave, any termination fee, the removal deadline and a bond to back it.
- Insurance, taxes and transfers: liability limits, who pays tax increases, assignment rules and any right of first refusal.
- Memorandum of lease: a short notarized summary you can record without stating the rent.
Sample cell tower lease
The sample below shows a completed lease with the term schedule, the rent and co-location terms, the removal section and the memorandum of lease.
Preview the document your answers produce — then build your own in minutes.
Build my cell tower leaseFederal rules that touch a cell site
Most of the federal rules for a wireless site fall on the tenant and its equipment. Our lease makes them the tenant’s duty, and leaves registration and marking of a tower you own with you.
Federal rules for cell sites
| Rule | What it requires | Source |
|---|---|---|
| FAA notice of construction | Notice to the FAA before building or altering a structure more than 200 feet above ground, or one that rises into the airspace near listed airports and heliports. | 14 C.F.R. § 77.9 |
| FCC antenna structure registration | The owner of a structure that needs FAA notice registers it with the FCC before construction or alteration, with a valid FAA no-hazard determination. | 47 C.F.R. § 17.4 |
| Radio-frequency exposure | FCC limits on human exposure to radio-frequency energy, with lower limits for the general public than for trained workers. | 47 C.F.R. § 1.1310 |
| Changes to existing towers | A state or local government may not deny an eligible facilities request that does not substantially change an existing tower or base station. | 47 U.S.C. § 1455(a) |
These rules do not decide what your lease allows. The lease still controls what the tenant may build on your property.
State notes printed by the builder
| State | Rule | Source |
|---|---|---|
| California | Creating a leasehold of 35 years or more, counting renewal options, is a change in ownership for property tax. The lease says who pays any resulting increase. | Cal. Rev. & Tax. Code § 61(c) |
| New York | A memorandum of a lease for more than three years may be recorded in place of the lease; all parties sign and acknowledge it. | N.Y. Real Prop. Law § 291-c |
Other states have their own recording and tax rules. Check with your county recorder and a local attorney.
A cell tower lease can last for decades, limit a later sale of your property and survive a change of carrier. Tenant forms often include automatic renewals, broad termination rights and a right of first refusal. LawVault is not a law firm, and this page is general information, not legal advice. Have a real estate attorney in your state review the lease, and check your mortgage for any lender consent you need.
How to create your cell tower lease
Download the free blank template and fill it in by hand, or answer the guided questions and let the builder write the lease for your site.
- Pick the state and the siteChoose the state where the property is, then tell us whether the tenant will build on raw land or use a rooftop, your tower, or a water tank or other structure.
- Name the partiesAdd the landowner (one or two people, or an organization and its signer) and the tenant company and the person signing for it, with mailing addresses.
- Describe the property and the spaceEnter the address, county, parcel number and legal description, the leased space, the tower or antenna height, the equipment and the access and utility routes.
- Set the term and the rentChoose the commencement date, the initial term, the renewal terms and how they start, then the starting rent and how it increases.
- Decide on sharing and endingChoose whether other carriers may use the site and whether you get a share of their rent, the tenant’s termination rights and any removal bond.
- Finish the other termsSet the liability insurance, who pays tax increases, the assignment rule and any right of first refusal, and add anything else you agreed on.
- Sign and recordDownload the lease and signing guide, sign the lease, sign the memorandum of lease before a notary, and have it recorded with the county.
Keep the signed lease, the recorded memorandum and every rent notice together. When the lease ends, the tenant must remove its equipment and sign a document confirming the lease is over; record it so the memorandum no longer clouds your title.
Common questions
A cell tower lease is a long-term lease in which a landowner rents a small piece of land, roof space, tower space or space on a structure such as a water tank to a wireless carrier or tower company. The tenant installs antennas and equipment, pays rent, and gets easements to reach the site and bring in power and fiber. These leases often run for decades once renewal terms are counted.
Yes. The PDF and Word files are free to download without an account. The PDF is a printable blank, not a fillable form; use the Word file or the guided builder to type your terms.
Many cell site leases start with an initial term of about five years followed by several renewal terms, so the whole lease can last 25 years or more. Renewals are often automatic unless the tenant says it will not renew. Our builder lets you set up to five renewal terms that renew automatically or only when the tenant gives notice. In California, a leasehold of 35 years or more, counting renewal options, is a change in ownership for property tax (Cal. Rev. & Tax. Code § 61(c)).
The lease can raise rent by a fixed percentage every year, by the Consumer Price Index every year with an optional cap, by a set percentage at the start of each renewal term, or not at all. Over a lease that may last decades, flat rent loses much of its value to inflation. Rent levels vary by market, so compare more than one offer before you sign.
The tenant does, in our lease. A structure more than 200 feet above ground, or one near certain airports, needs advance notice to the FAA (14 C.F.R. § 77.9), and an antenna structure that needs FAA notice must be registered with the FCC by its owner (47 C.F.R. § 17.4). The tenant also keeps radio-frequency emissions within the FCC exposure limits (47 C.F.R. § 1.1310). If the tower is yours and the carrier leases space on it, registration and marking of your tower stay with you.
Federal law limits how a town or county can review some changes to an existing tower or base station: it may not deny an eligible facilities request that does not substantially change the structure’s size (47 U.S.C. § 1455(a)). That rule is about zoning, not about your lease. Your lease still decides what the tenant may add, and our builder requires a structural analysis before more weight goes on a roof, tower or structure.
It lets the tenant match an offer you accept from someone else. Tenants often ask for one so that a company buying the rent stream cannot take over the lease. A broad right that covers a sale of your whole property can discourage buyers, so our builder lets you limit it to a sale of the lease, the rent or an easement, or leave it out, and it never applies to transfers to family, a trust or by inheritance.
Recording a short memorandum of lease gives later buyers and lenders notice of the tenant’s rights without making the rent public, and tenants usually require it. The memorandum is signed in ink before a notary. In New York, a memorandum of a lease for more than three years may be recorded in place of the lease, and the lease itself must be shown to the recording officer (N.Y. Real Prop. Law § 291-c).
Still unsure? Visit the help center.
Ways to get your cell tower lease
Answer the questions and preview the finished document free. You pay only when you’re ready to download, print or e-sign it, and you can choose how.
Free 7-day trial subscription Cancel anytime
$49/mo $0 for one week
Unlimited access to 210+ legal documents for 7 days. After the trial it renews at $49 a month unless you cancel at least 24 hours before it ends.
Start 7-day trialPro, billed yearly
$9.99/moBest value · Save 80%
Unlimited documents and edits, e-signature for every party, and the freedom to amend and re-issue at any time. Billed $119.88 a year and renews annually. Cancel anytime.
Start annual planSingle document
$39One-time, no renewal
Unlock just this cell tower lease: a permanent PDF download, printing, e-signature for every party and a tamper-evident audit trail, with no subscription.
Build this documentPrices in USD. Free blank templates stay free. Compare plans or read the refund policy.