What is an Alabama construction contract?
An Alabama construction contract is the written agreement between a property owner and a contractor for building, remodeling or repair work. It sets out the work, the price, the payment schedule, the dates, change orders, the warranty and what happens if either side does not perform.
Alabama regulates residential builders and remodelers through the Home Builders Licensure Board. The Board’s law does not list every term a contract must hold, but it does require a licensed builder to put the deal in a written contract with its license number. Commercial work falls under different licensing rules.
Alabama construction contract rules
Alabama construction contract rules at a glance
| Topic | Rule | Source |
|---|---|---|
| Contractor license | Home Builders Licensure Board license for residential building, repair or improvement over $10,000 (roofing over $2,500), up to three floors and four units | Ala. Code §§ 34-14A-2, 34-14A-5 |
| Written contract | A licensee must use a valid written contract that shows its Board license number | Ala. Code § 34-14A-7(f) |
| Deposit limit | No statewide rule | None |
| Right to cancel | Federal rule: three business days for a qualifying sale made at the buyer’s home | 16 C.F.R. Part 429 |
| Lien notice from the contractor | None before filing for a contractor hired by the owner; others give the owner written notice first | Ala. Code § 35-11-218 |
| Other notices | Written disclosure before work starts if the home will meet a resiliency program beyond code; list of suppliers and workers on the owner’s request | Ala. Code §§ 34-14A-7(h), 35-11-219 |
The license number and the written contract
Alabama’s rule is short but strict. A licensee must work under a valid written contract, and the contract must carry the license number the Board issued. The same number has to appear in the builder’s advertising. The Board can fine a licensee up to $5,000 for each violation of the chapter (Ala. Code § 34-14A-8).
The license applies only above set amounts. Residential work is covered when the cost of the job, counting materials, labor, supervision, overhead and profit, is more than $10,000. Roofing on a residence is covered above $2,500.
Liens and payment
A subcontractor or supplier who is not paid can claim a lien in Alabama, but usually only up to the balance the owner still owes the contractor. A supplier that warns the owner in writing before delivering materials can claim the full price unless the owner objects in writing (Ala. Code § 35-11-210). Lien waivers with each payment help the owner show that everyone was paid.
How the builder handles Alabama
The Alabama build uses the builder’s general wording, because Alabama’s rules are not yet in the contract engine. It writes the payment schedule, written change orders, lien waivers with each payment and final waivers with the last one, and the workmanship warranty from your answers. When an individual owner on a residential project signs at home, it adds the federal three-business-day right to cancel.
The license number field is optional in the Alabama build. Alabama law requires a licensed builder’s number in the contract, so enter it.
An unlicensed builder on a covered Alabama job breaks state law, and the contract must show the license number. LawVault is a document service, not a law firm, and this page is not legal advice. Look up the builder with the Home Builders Licensure Board, and talk to an Alabama lawyer about a large or disputed project.
What an Alabama construction contract should include
- Parties: the owner, the contractor and the contractor’s Board license number
- Property and scope: the address, the work, plans by name and date, and exclusions
- Price and payments: the price, any deposit and payments tied to finished stages
- Schedule: start and substantial completion dates and how delays are handled
- Changes and liens: signed change orders and lien waivers with each payment
- Warranty and insurance: the warranty period and the contractor’s coverage
- Resiliency disclosure: a written statement if the home will meet a program beyond code
How to create your Alabama construction contract
- Pick the projectChoose a new home, a renovation, an addition, a repair, a commercial build-out or another project.
- Add the owner and contractorEnter both parties, who signs for a business, the contractor’s address and phone, and the Board license number.
- Describe the projectAdd the property, the scope of work, plans, exclusions, materials and who gets the permits.
- Set the scheduleEnter the start and completion dates, whether the date is firm, and any daily delay credit.
- Set the price and paymentsPick a fixed price, cost plus or time and materials, then the deposit, retainage and payment schedule.
- Finish and signSet insurance, warranty, cleanup, ending and disputes, answer the cooling-off question, then date and sign.
This page reflects Alabama law as of November 2026.
Common questions
Yes, above set amounts. A residential home builder must hold a license from the Home Builders Licensure Board, renewed every year (Ala. Code § 34-14A-5). The license covers building, repairing or improving a residence of up to three floors and four units when the cost of the job is more than $10,000, or more than $2,500 for residential roofing (§ 34-14A-2). An owner working on the owner’s own property is not covered.
For a licensed home builder, yes. Each licensee must use a valid written contract when doing residential home building, and the contract must show the license number the Board issued (Ala. Code § 34-14A-7(f)).
Alabama has no statewide cap on a construction deposit. The amount is up to the owner and the contractor, so tie later payments to finished stages of the work.
The federal Cooling-Off Rule gives a buyer three business days to cancel a qualifying sale made at the buyer’s home (16 C.F.R. Part 429). The builder adds that clause when an individual owner on a residential project signs at home.
A contractor hired directly by the owner does not give a notice before filing a lien. Everyone else gives the owner written notice of the claim first (Ala. Code § 35-11-218). The original contractor must give the owner, when asked, a list of its suppliers, laborers and employees, or it loses its lien (§ 35-11-219).
Yes. The PDF and Word files are free to download without an account. The PDF is a printable blank, not a fillable form; use the Word file or the guided builder to type your terms.
Still unsure? Visit the help center.
Ways to get your construction contract
Answer the questions and preview the finished document free. You pay only when you’re ready to download, print or e-sign it, and you can choose how.
Free 7-day trial subscription Cancel anytime
$49/mo $0 for one week
Unlimited access to 260+ legal documents for 7 days. After the trial it renews at $49 a month unless you cancel at least 24 hours before it ends.
Start 7-day trialPro, billed yearly
$9.99/moBest value · Save 80%
Unlimited documents and edits, e-signature for every party, and the freedom to amend and re-issue at any time. Billed $119.88 a year and renews annually. Cancel anytime.
Start annual planSingle document
$39One-time, no renewal
Unlock just this construction contract: a permanent PDF download, printing, e-signature for every party and a tamper-evident audit trail, with no subscription.
Build this documentPrices in USD. Free blank templates stay free. Compare plans or read the refund policy.