Step 1 of 7 · Getting Started

Free Florida Construction Contract Template

Your answers save as you go. Legal form tools, not legal advice.

Free template

Download a free construction contract template

Free blank form—no account or payment required. The PDF is printable and the Word file is editable. This general version does not include state-specific clauses or disclosures.

Build a guided Florida version
Real EstateLast updated November 23, 20264 min read

What is a Florida construction contract?

A Florida construction contract is the written agreement between a property owner and a contractor for building, remodeling or repair work. It sets the scope, the price, the payment schedule, the timeline and the process for changes.

Florida does not have one statute listing every term of a home improvement contract. Instead, several laws each add a piece: the license number, the construction lien law notice, the recovery fund notice and the deposit rule. Most of them apply to residential work, including new homes.

Florida construction contract rules

Florida construction contract rules at a glance

TopicRuleSource
Contractor licenseContractors are certified or registered under chapter 489; the number must appear in each offer, bid, contract and advertisementFla. Stat. § 489.119(5)(b)
Written contract contentsNo single statutory list; the license number, lien law notice and recovery fund notice must appearFla. Stat. §§ 489.119, 713.015, 489.1425
Deposit limitNo cap. Over 10 percent up front on residential work: apply for permits within 30 days and start within 90 days after permits issue, unless just cause or a written extensionFla. Stat. § 489.126(2)
Right to cancelHome solicitation sales over $25: cancel before midnight of the third business day after signing; statement under the caption BUYER’S RIGHT TO CANCELFla. Stat. §§ 501.021, 501.031
Lien notice to ownerDirect contracts over $2,500 for homes of up to four units: notice beginning ACCORDING TO FLORIDA’S CONSTRUCTION LIEN LAW, 12-point bold capitals, front page or a separate signed and dated pageFla. Stat. § 713.015
Other noticesResidential contracts over $2,500 in labor and materials: Homeowners’ Construction Recovery Fund statement with the Licensing Board’s address and phoneFla. Stat. § 489.1425

The lien law notice

The § 713.015 notice explains Florida's construction lien law to the owner before the job starts. Copy it word for word from the statute, in at least 12-point bold capital letters, and put it on the front page or on a separate page the owner signs and dates. Under § 713.015(2)(b), leaving it out does not stop a lien against a person who was not adversely affected, so the omission matters most when the owner was.

The 10 percent deposit rule

A contractor can take more than 10 percent up front on residential work, but the deposit starts two clocks: 30 days to apply for permits, and 90 days after the permits issue to start work. If the contractor misses them, the owner's first step is a written demand sent by certified mail, return receipt requested, to the address in the contract.

How the builder handles Florida

For any residential project, including a new home, the contract adds a "State Law Requirements" section. When a deposit is entered, it states the Florida deposit rule. It also commits the contractor to give the owner the § 713.015 lien law notice before the owner signs, on the front page or on a separate page the owner signs and dates. The contract does not print the notice's statutory wording; the Signing Guide tells the contractor to copy it word for word from the statute and explains the deposit deadlines and the certified mail demand. The payment step reminds you of the deposit rule. The builder also sets a payment schedule, written change orders, lien waivers with each payment and a warranty, and adds the federal three-day right to cancel when an individual owner on a residential project says the contract is signed at home. Enter the license number, which is optional in the builder, and add the recovery fund statement yourself.

Add the Florida notices

Florida requires exact notices in residential contracts, and leaving out the recovery fund statement can bring Licensing Board fines. LawVault is a document service, not a law firm, and this page is not legal advice. Check the finished contract against the statutes and have a Florida lawyer review a large project.

What a Florida construction contract should include

  • Parties: the owner and the contractor, with the contractor's certification or registration number
  • Scope and price: the work, materials, price and a payment schedule tied to the work
  • Deposit terms: the deposit amount and the permit and start dates if it is over 10 percent
  • Lien law notice: for homes of up to four units and contracts over $2,500
  • Recovery fund statement: for residential contracts over $2,500 in labor and materials
  • Changes and liens: written change orders and lien waivers with each payment

How to create your Florida construction contract

  1. Pick the projectChoose the kind of project. Residential work, including a new home, picks up the Florida terms.
  2. Add the owner and contractorEnter both parties, the contractor's address and phone, and the license number.
  3. Describe the workAdd the property, scope, plans, exclusions, materials and who pulls the permits.
  4. Set the schedule and pricePick the dates, the price type, any deposit and the payment schedule.
  5. Add work termsSet insurance, warranty and site rules, and add the recovery fund statement under Additional Terms.
  6. Attach the notice and signAdd the lien law notice from § 713.015, have the owner sign and date it, then sign the contract.

This page reflects Florida law as of November 2026.

Common questions

A direct contract between an owner and a contractor for improvements to a home of up to four units, for more than $2,500, must carry a notice that begins ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW. It goes in at least 12-point bold capital letters, on the front page or on a separate page the owner signs and dates (Fla. Stat. § 713.015).

Not with a cap. A contractor who takes more than 10 percent of the contract price up front on residential work must apply for permits within 30 days and start work within 90 days after the permits issue, unless it has just cause or the owner agreed in writing to a longer period (Fla. Stat. § 489.126(2)).

Yes. Each contractor's registration or certification number must appear in every offer of services, business proposal, bid, contract and advertisement it uses in contracting (Fla. Stat. § 489.119(5)(b)).

A residential repair, improvement or construction contract where labor and materials exceed $2,500 must include a written statement about the Florida Homeowners' Construction Recovery Fund, followed by the Construction Industry Licensing Board's address and phone number (Fla. Stat. § 489.1425).

If the job was a home solicitation sale over $25, solicited in person away from the contractor's business location, the buyer may cancel before midnight of the third business day after signing. The agreement must include a statement under the caption BUYER'S RIGHT TO CANCEL (Fla. Stat. §§ 501.021, 501.031).

Yes. The PDF and Word files are free to download without an account. The PDF is a printable blank, not a fillable form; use the Word file or the guided builder to type your terms.

Still unsure? Visit the help center.

Ways to get your construction contract

Answer the questions and preview the finished document free. You pay only when you’re ready to download, print or e-sign it, and you can choose how.

Free 7-day trial subscription Cancel anytime

$49/mo $0 for one week

Unlimited access to 260+ legal documents for 7 days. After the trial it renews at $49 a month unless you cancel at least 24 hours before it ends.

Start 7-day trial

Pro, billed yearly

$9.99/moBest value · Save 80%

Unlimited documents and edits, e-signature for every party, and the freedom to amend and re-issue at any time. Billed $119.88 a year and renews annually. Cancel anytime.

Start annual plan

Single document

$39One-time, no renewal

Unlock just this construction contract: a permanent PDF download, printing, e-signature for every party and a tamper-evident audit trail, with no subscription.

Build this document

Prices in USD. Free blank templates stay free. Compare plans or read the refund policy.

Build your construction contract in minutes

Preview the document your answers produce — then review, e-sign, or download it.

State-specific · E-sign ready · Legal form tools, not legal advice