What is a Pennsylvania construction contract?
A Pennsylvania construction contract is the written agreement between a property owner and a contractor for building, remodeling or repair work. Work on an existing home usually falls under the Home Improvement Consumer Protection Act, 73 P.S. § 517.1 and following. That Act covers work on a private residence or its land when the total cash price is more than $500, and it excludes building a new home.
The Act is strict. A home improvement contract that misses a required item is not valid or enforceable against the owner, and some clauses let the owner void the whole contract.
Pennsylvania home improvement contract rules
Pennsylvania construction contract rules at a glance
| Topic | Rule | Source |
|---|---|---|
| License or registration | Register with the Bureau of Consumer Protection in the Office of Attorney General before offering or performing home improvements; a person with less than $5,000 of home improvements in the previous tax year is not a contractor under the Act | 73 P.S. §§ 517.2, 517.3 |
| Written contract | Written and legible with the registration number; signed and dated; the entire agreement with notices attached; the contractor's name, street address and phone; approximate start and completion dates; the work, materials and specifications; the total price, or a time-and-materials estimate with a 10% cap; the down payment listed separately; known subcontractors; liability insurance of at least $50,000 personal injury and $50,000 property damage with current coverage; the toll-free number; notice of the right to rescind | 73 P.S. § 517.7(a) |
| Deposit or down payment | On a contract over $5,000, no more than one-third of the price plus designated special order materials; no payment before the contract is signed | 73 P.S. § 517.9 |
| Right to cancel | Three business days from signing, wherever signed, without penalty; emergency exception under 73 P.S. § 201-7 | 73 P.S. § 517.7(b) |
| Mechanics lien notice | No statewide rule | None |
| Other notices | An arbitration clause must be in capitals, 12-point bold, on a separate page with separate signatures, and say whether the decision is binding and confidential. The owner may void a contract with a hold harmless clause, confession of judgment, jury waiver, or a clause awarding the contractor attorney fees, among others | 73 P.S. § 517.7(d), (e) |
Deposits, changes and payment
Pennsylvania limits how much money changes hands up front. On a contract over $5,000, the deposit may be no more than one-third of the price, plus the cost of special order materials the contract designates. No payment may be taken before the contract is signed. Any material change to the plans or specifications needs a written change order, signed and dated, that includes any price change.
A time-and-materials contract must give a written estimate and state that the cost will not exceed the estimate by more than 10 percent without a signed change order. The contract states that ceiling in dollars.
Clauses the owner can void
Section 517.7(e) lists clauses that let the owner void a home improvement contract. They include a hold harmless clause, a waiver of building code requirements, a confession of judgment, a waiver of jury trial, a clause awarding the contractor attorney fees and costs, a waiver of the Act's rights, and an automatic renewal without the required opt-out procedure. Keep them out of the contract, including under Additional Terms.
How the builder handles Pennsylvania
For a home improvement project (a renovation, an addition, a repair or another residential project on an existing home), the contract adds a "State Law Requirements" section. It commits the contractor to liability insurance of at least $50,000 for personal injury and $50,000 for property damage and states the current coverage, and it leaves a line for the known subcontractors. On a time-and-materials job it states the estimate and the dollar ceiling at 10 percent over it. A "Right to Rescind" paragraph gives the owner three business days wherever the contract is signed, so the federal at-home question is asked only for a new home.
The registration number is required and prints near the top. The wizard requires the liability coverage, at least $50,000, and an estimate for a time-and-materials home improvement job. It does not offer arbitration or an attorney fees clause on a home improvement project, and the indemnity does not use hold harmless wording. A fixed price gets a payment schedule, and every contract has written change orders, lien waivers with each payment and a warranty. The Signing Guide lists the § 517.7 contents. The wizard does not cap the deposit, so keep it within the one-third limit yourself.
A Pennsylvania home improvement contract that leaves out a required item cannot be enforced against the owner. LawVault is a document service, not a law firm, and this page is not legal advice. Attach every required notice, and talk to a Pennsylvania lawyer about a large or unusual job.
What a Pennsylvania construction contract should include
- Contractor: name, street address, phone and home improvement registration number
- Dates: the agreement date and approximate start and completion dates
- Work: the work, materials and specifications, changed only by signed change order
- Price: the total price, or a written estimate with the 10 percent ceiling for time and materials
- Payments: the down payment listed separately and within the deposit limit
- Subcontractors and insurance: known subcontractors and the liability coverage
- Notices: the toll-free number and the three-day right to rescind
How to create your Pennsylvania construction contract
- Pick the projectChoose a new home, a renovation, an addition, a repair, a commercial build-out or another project.
- Add the owner and contractorEnter both parties, who signs for a business, the contractor’s street address and phone, and the registration number.
- Describe the workAdd the property, the scope, plans, exclusions, who supplies materials and who gets the permits.
- Set the dates and priceChoose the start and completion dates, then a fixed price, cost plus or time and materials with an estimate, the deposit and the payment schedule.
- Add work termsEnter the liability coverage of at least $50,000, the warranty, site rules and cleanup.
- Finish and signChoose how disputes are settled, add your own terms without voidable clauses, attach the required notices and sign.
This page reflects Pennsylvania law as of November 2026.
Common questions
Under 73 P.S. § 517.7, the contract must be written and legible, show the contractor's registration number, be signed and dated, contain the entire agreement with all required notices attached, and list the contractor's address and phone, the approximate start and completion dates, the work and materials, the total price, the down payment, known subcontractors, liability insurance, the state's toll-free number and a notice of the right to rescind. Otherwise it is not valid or enforceable against the owner.
Yes, for home improvement work. Section 517.3 requires a contractor to register with the Bureau of Consumer Protection in the Office of Attorney General before offering or performing home improvements. A person whose home improvements totaled less than $5,000 in the previous tax year is not a contractor under the Act.
Three business days from the date of signing, wherever the contract was signed (73 P.S. § 517.7(b)). The emergency provisions of the Unfair Trade Practices and Consumer Protection Law are the exception.
For a contract over $5,000, a deposit may not exceed one-third of the price, plus the cost of special order materials designated in the contract (73 P.S. § 517.9). A contractor also may not demand or accept payment before the contract is signed.
No. The definition of home improvement in 73 P.S. § 517.2 excludes the construction of a new home. It covers work on a private residence and its land where the total cash price is more than $500.
Yes. The PDF and Word files are free to download without an account. The PDF is a printable blank, not a fillable form; use the Word file or the guided builder to type your terms.
Still unsure? Visit the help center.
Ways to get your construction contract
Answer the questions and preview the finished document free. You pay only when you’re ready to download, print or e-sign it, and you can choose how.
Free 7-day trial subscription Cancel anytime
$49/mo $0 for one week
Unlimited access to 260+ legal documents for 7 days. After the trial it renews at $49 a month unless you cancel at least 24 hours before it ends.
Start 7-day trialPro, billed yearly
$9.99/moBest value · Save 80%
Unlimited documents and edits, e-signature for every party, and the freedom to amend and re-issue at any time. Billed $119.88 a year and renews annually. Cancel anytime.
Start annual planSingle document
$39One-time, no renewal
Unlock just this construction contract: a permanent PDF download, printing, e-signature for every party and a tamper-evident audit trail, with no subscription.
Build this documentPrices in USD. Free blank templates stay free. Compare plans or read the refund policy.