Step 1 of 7 · Getting Started

Free Utah Construction Contract Template

Your answers save as you go. Legal form tools, not legal advice.

Free template

Download a free construction contract template

Free blank form—no account or payment required. The PDF is printable and the Word file is editable. This general version does not include state-specific clauses or disclosures.

Build a guided Utah version
Real EstateLast updated November 23, 20264 min read

What is a Utah construction contract?

A Utah construction contract is the written agreement between a property owner and a contractor for building, remodeling or repair work. It sets out the scope, the price, the payment schedule, the dates, how changes are approved and who handles permits.

Utah has two rules that change what goes on the page for home work. A contract for an owner-occupied residence must explain how the owner can be protected from liens, and a sale the contractor starts at the owner’s home needs a bold cancellation statement on the front page.

Utah construction contract rules

Utah construction contract rules at a glance

TopicRuleSource
Contractor licenseContractors are licensed by the Division of Professional Licensing; alteration, repair or remodeling jobs under $7,000 (labor, materials and changes) are exempt, with a one-time affirmation filed over $3,000Utah Code § 58-55-305(1)(h)
Written contract contentsFor an owner-occupied residence, the written contract must state what the owner must do to be protected from liens for the workUtah Code § 38-11-108
Deposit limitNo statewide ruleNone
Right to cancelSale started by the seller at the buyer’s home or workplace: cancel until midnight of the third business day after the sale or receipt, whichever is later; refund within 30 daysUtah Admin. Code R152-11-9
Lien notice from the contractorThe residence lien protection statement above goes in the written contract with the ownerUtah Code § 38-11-108
Other noticesA conspicuous cancellation statement on the front page of the purchase documents, in dark bold type of at least 12 pointsUtah Admin. Code R152-11-9

Protecting the homeowner from liens

Utah’s residence lien law can protect the owner of an owner-occupied home from a mechanic’s lien or a suit for money owed for the work, if the owner meets the law’s conditions. Section 38-11-108 puts the burden of explaining those conditions on the original contractor or developer. The explanation belongs in the written contract itself, so add it before the owner signs.

  • Write the statement in the contract, not in a separate letter
  • Check the Division of Professional Licensing for any required form or wording
  • Keep the contract, change orders and payment records together

How the builder handles Utah

The builder does not yet add Utah terms to a State Law Requirements section, and it does not print the § 38-11-108 statement; the license number is optional. It writes the project description, the price and a payment schedule that lists the deposit and up to six payments, written change orders, lien waivers with each payment, permits, insurance and a workmanship warranty. When an individual owner on a residential project says the contract will be signed at home, it adds the federal three-business-day right to cancel in our own words. Add the residence lien statement under Additional Terms, and put Utah’s front-page cancellation statement on the contract yourself.

Add the Utah statements yourself

A Utah home contract needs the residence lien statement and, for a sale made at the owner’s home, the front-page cancellation statement. LawVault is a document service, not a law firm, and this page is not legal advice. Check the current statute and rule text, and talk to a Utah lawyer about a large project.

What a Utah construction contract should include

  • Parties: the owner, the contractor and the contractor’s license number
  • Property and scope: the address, a detailed description of the work, plans and exclusions
  • Price and payments: a fixed price or cost basis, any deposit and a schedule tied to stages of work
  • Schedule: start and substantial completion dates
  • Changes and liens: written change orders, lien waivers with each payment and the § 38-11-108 statement
  • Cancellation statement: the R152-11-9 front-page statement when the sale is made at the owner’s home

How to create your Utah construction contract

  1. Pick the projectChoose a new build, renovation, addition, repair, commercial build-out or other project.
  2. Add the owner and contractorEnter both parties, who signs for a business, the contractor’s address and phone, and the license number.
  3. Describe the workAdd the property, the scope, any plans and exclusions, who supplies materials and who gets the permits.
  4. Set dates and paymentsChoose the start and completion dates, the price type, the deposit and the payment schedule.
  5. Add work termsSet the insurance limit, the warranty, site rules, how the agreement can end and how disputes are settled.
  6. Add Utah statements and signAdd the residence lien statement and any cancellation statement, then sign on paper or electronically.

This page reflects Utah law as of November 2026.

Common questions

Generally, yes. Utah licenses construction contractors under Title 58, Chapter 55 of the Utah Code, through the Division of Professional Licensing. A small alteration, repair or remodeling job can be exempt, as the next answer explains.

Yes. Alteration, repair, remodeling, addition or improvement work with a contracted value under $7,000, counting labor, materials and all changes, is exempt from licensure (Utah Code § 58-55-305(1)(h)). If the project is over $3,000, the person must file a one-time affirmation with the Division. Plumbing and electrical work on these jobs generally still needs licensed trades.

For an owner-occupied residence, the original contractor or real estate developer must state in the written contract what the owner must do to be protected from a mechanic’s lien or other suit for money owed for the work (Utah Code § 38-11-108). The Division may set the form and content of that notice by rule.

Often. Under a Utah consumer protection rule, a buyer in a sale the seller started at the buyer’s home or workplace may cancel until midnight of the third business day after the sale or after receiving the product, whichever is later (Utah Admin. Code R152-11-9). The seller refunds payments within 30 days of a valid cancellation notice. The federal Cooling-Off Rule can also apply.

The rule requires a conspicuous statement on the front page of the purchase documents, in dark bold type of at least 12 points, that begins: You, the Buyer, May Cancel This Transaction At Any Time Prior to Midnight of the Third Business Day. Copy the full wording from R152-11-9.

Yes. The PDF and Word files are free to download without an account. The PDF is a printable blank, not a fillable form; use the Word file or the guided builder to type your terms.

Still unsure? Visit the help center.

Ways to get your construction contract

Answer the questions and preview the finished document free. You pay only when you’re ready to download, print or e-sign it, and you can choose how.

Free 7-day trial subscription Cancel anytime

$49/mo $0 for one week

Unlimited access to 260+ legal documents for 7 days. After the trial it renews at $49 a month unless you cancel at least 24 hours before it ends.

Start 7-day trial

Pro, billed yearly

$9.99/moBest value · Save 80%

Unlimited documents and edits, e-signature for every party, and the freedom to amend and re-issue at any time. Billed $119.88 a year and renews annually. Cancel anytime.

Start annual plan

Single document

$39One-time, no renewal

Unlock just this construction contract: a permanent PDF download, printing, e-signature for every party and a tamper-evident audit trail, with no subscription.

Build this document

Prices in USD. Free blank templates stay free. Compare plans or read the refund policy.

Build your construction contract in minutes

Preview the document your answers produce — then review, e-sign, or download it.

State-specific · E-sign ready · Legal form tools, not legal advice