What is a mechanic's lien?

A mechanic's lien is a legal claim against a piece of real estate, filed by someone who added value to it and was not paid. The word "mechanic" is old. Today the right belongs to general contractors, subcontractors, material suppliers, equipment renters and workers, and in some states to architects and engineers.

The claim itself is a short document, often called a claim of lien, a lien affidavit or a notice of lien. It names the claimant and the owner, describes the property and the work, states the dates and the unpaid amount, and is signed under oath. You record it with the county office that keeps land records. From that moment, anyone who searches the title sees your claim.

That visibility is the point. A recorded lien makes the property hard to sell or refinance until the debt is settled, which gives the owner a strong reason to pay. If payment still does not come, the lien lets you ask a court to order the property sold to pay you, as long as you sue within the time your state allows.

Mechanic's liens are strict. A claim filed one day late, served on the wrong person or missing a required statement can be thrown out, and the right to a lien is often lost for good. Our builder helps with the paperwork and shows your state's deadline where we have confirmed it, but it cannot make a late or invalid claim valid.

Key features
  • A claim of lien for any of the four common claimants: a contractor hired by the owner, a subcontractor, a supplier, or a worker
  • Built for the state where the property is, with that state's name for the document where we have confirmed it
  • Owner, legal description, parcel number, hiring party, original contractor, contract, dates of first and last furnishing, and the amount after credits
  • A notary verification, or a statement under penalty of perjury with an acknowledgment where the state calls for one
  • State statements and attachments we have verified, such as the Texas homestead notice and the Arizona preliminary notice
  • A proof of service page for the copy you send the owner
  • A guidance page with the recording deadline, computed as a date for contractors in states with a verified day count

Types of mechanic's liens

The builder starts by asking how you worked on the property, because your place in the payment chain changes what the claim must say and which notices you needed to send.

Contractor’s Lien

For a general or prime contractor hired directly by the owner. The claim recites the contract with the owner and, where we have a verified day count, the guidance page computes your recording deadline.

Create

Subcontractor’s Lien

For a trade contractor hired by the general contractor or another subcontractor. The claim names who hired you and the original contractor, and recites any preliminary notice you gave.

Create

Supplier’s Lien

For a company that delivered materials or equipment to the job. Suppliers often must send an early notice to the owner to keep their lien rights.

Create

Laborer’s Lien

For a worker paid by the hour or day who was not paid for labor on the property.

Create

When to use a mechanic's lien

A lien makes sense when you furnished labor or materials to private real estate, the work is done or you stopped because you were not paid, and an invoice or a demand letter has not worked. Common situations:

  • A homeowner stops paying a remodeler after a dispute over the final invoice
  • A general contractor is paid by the owner but does not pay its subcontractors
  • A supplier delivers lumber or concrete to a job and the buyer's check bounces
  • A commercial tenant orders a build-out and the landlord's property ends up carrying the bill

Before you record, think about timing and accuracy. A lien filed too late fails. A lien for more than you are owed can fail too, and in many states can expose you to penalties. If you want to give the owner one more chance first, send a demand letter that names your lien deadline. When you are paid, give the owner a lien waiver or record a release so the title is clear.

What a mechanic's lien should include

State statutes list the required contents, and they overlap heavily. A complete claim includes:

  • Claimant: your exact legal name and address, and your license number where the state asks for it.
  • Owner: the owner shown in the land records, which may not be the person who hired you.
  • Property: the street address, county, parcel number and legal description from the deed.
  • Hiring party and original contractor: who hired you or bought your materials, and the contractor the owner hired.
  • Contract: whether it was written or oral, and its date.
  • Work: a general description of the labor, services, materials or equipment you furnished.
  • Dates: the first and last days you furnished labor or materials.
  • Amount: the price or value, the payments and credits, and the unpaid balance you claim.
  • Notices: the dates of any preliminary notice, notice to owner or notice of intent your state requires.
  • Oath and service: a sworn verification and proof that the owner received a copy.

Sample mechanic's lien

The sample below shows how a finished claim is organized, from the recording block and the parties through the amount claimed, the verification and the proof of service.

Preview the document your answers produce — then build your own in minutes.

Build my mechanic's lien

Deadlines in key states

These rows come from the statute text and cover the two deadlines that matter most: when to record and when to sue. They are not a 50-state survey. For other states, the builder tells you to confirm the deadline before recording instead of guessing.

Recording and enforcement deadlines

StateRecord the claimSue to forecloseSource
CaliforniaDirect contractor: within 90 days after completion of the project, or 60 days after a recorded notice of completion, whichever is earlierWithin 90 days after recordingCal. Civ. Code §§ 8412, 8460
Texas15th day of the 4th month after the month of completion or last work (3rd month for residential projects)By the first anniversary of the last day to fileTex. Prop. Code §§ 53.052, 53.158
FloridaWithin 90 days after final furnishingWithin 1 year after recordingFla. Stat. §§ 713.08, 713.22
New YorkWithin 8 months after completion or final furnishing (4 months for a single-family dwelling)Within 1 year after filing, unless extendedN.Y. Lien Law §§ 10, 17
ArizonaWithin 120 days after completion, or 60 days after a recorded notice of completionWithin 6 months after recordingA.R.S. §§ 33-993, 33-998
WashingtonWithin 90 days after you stop furnishing labor or materialsWithin 8 months after recordingRCW 60.04.091, 60.04.141
GeorgiaWithin 90 days after completing the work or furnishing materialsWithin 365 days after filingO.C.G.A. § 44-14-361.1
North CarolinaWithin 120 days after last furnishing at the siteWithin 180 days after last furnishingN.C. Gen. Stat. §§ 44A-12, 44A-13
ColoradoWithin 4 months after last labor or materials, after a notice of intent served at least 10 days before filingWithin 6 months after last work or completionC.R.S. §§ 38-22-109, 38-22-110
VirginiaWithin 90 days after the last day of the month of last work, and no later than 90 days after the job endsLater of 6 months after recording or 60 days after completionVa. Code §§ 43-4, 43-17

Lien statutes change, and the event that starts the clock differs by state and by claimant. Confirm the current rule before you rely on any date.

Three patterns stand out. Deadlines run from different events: your own last day of work, completion of the whole project, or a notice the owner records. Some states count in days and others in months, and Texas and Virginia tie the deadline to the end of a calendar month. And the time to sue is short, sometimes only 90 days after recording, so a lien is the start of a collection plan, not the end of one.

A late or defective lien is usually lost

Mechanic's lien rights depend on strict compliance with your state's statute. Missing a deadline, skipping a required notice or overstating the amount can void the lien. The builder does not check whether you have lien rights or whether you are on time, and it never promises that a lien is valid. LawVault is a document service, not a law firm, and nothing on this page is legal advice. For a large claim, talk to a construction lawyer in the state where the property is located.

How to create your mechanic's lien

You can download the free blank template and fill it in yourself, or answer guided questions and let the builder assemble the claim for your state.

  1. Pick your role and stateChoose contractor, subcontractor, supplier or worker, and the state where the property is located. The state decides the title, the oath and the deadline guidance.
  2. Enter your detailsAdd your legal name and address, your license number if you have one, and the person who signs for your business.
  3. Describe the owner and propertyEnter the owner from the land records, the street address, county, parcel number and the legal description from the deed, and say what kind of building it is.
  4. Add the contract and the workName who hired you and the original contractor, say whether the contract was written or oral, describe what you furnished, and enter your first and last dates of work.
  5. State the amount and noticesEnter the price, the payments and credits, and the unpaid amount, plus the date of any preliminary notice or notice of intent you served.
  6. Choose service and returnPick how you will send the owner a copy and who receives the recorded original.
  7. Sign, record and serveDownload the PDF or Word file, sign the verification in front of a notary, record the claim with the county, serve the owner, and note the date by which you must sue.

A strong mechanic's lien is accurate, on time and backed by records. Keep your contract, change orders, invoices, delivery tickets and proof of every notice together, record the claim well before the deadline, and put the date to sue on your calendar the day you record.

Common questions

It is a claim against real estate by someone who improved it and was not paid: a contractor, subcontractor, supplier or worker. Once recorded with the county, the lien clouds the owner's title, so the property is hard to sell or refinance until the debt is paid, and the claimant can ask a court to foreclose. Every state creates the right by statute, and each statute sets its own deadlines and contents.

Yes. The PDF and Word files are free to download without an account. The PDF is a printable blank, not a fillable form; use the Word file or the guided builder to type your terms.

Not long, and it varies. Florida allows 90 days after your final furnishing of labor or materials (Fla. Stat. § 713.08(5)). A California direct contractor has 90 days after completion of the project, or 60 days after the owner records a notice of completion (Cal. Civ. Code § 8412). Texas sets the 15th day of the fourth month after the month of completion or last work, or the third month on residential projects (Tex. Prop. Code § 53.052). New York allows 8 months, or 4 months for a single-family home (N.Y. Lien Law § 10).

In most states the claim is sworn or verified, which means signing in front of a notary. California requires the claim to be signed and verified (Cal. Civ. Code § 8416), Texas requires a sworn affidavit (Tex. Prop. Code § 53.054), and Florida requires the claim to be sworn to or affirmed (Fla. Stat. § 713.08(2)). Washington requires a statement under penalty of perjury plus a notary acknowledgment (RCW 60.04.091). Our document prints the verification your state's form calls for.

Serve the owner and watch the second deadline. Texas requires a copy to the owner within 5 days after filing (Tex. Prop. Code § 53.055), Florida within 15 days (Fla. Stat. § 713.08(4)(c)) and Washington within 14 days (RCW 60.04.091). The lien then expires unless you sue to foreclose in time: 90 days after recording in California (Cal. Civ. Code § 8460), 6 months in Arizona (A.R.S. § 33-998) and 1 year in Florida (Fla. Stat. § 713.22).

Usually yes, but many states first require an early notice. In California a claimant who must give a preliminary notice has 20 days after first furnishing work, and a late notice covers only recent work (Cal. Civ. Code § 8204). Florida lienors who are not in privity with the owner serve a notice to owner within 45 days after starting (Fla. Stat. § 713.06(2)(a)). Arizona's claim must attach the preliminary twenty-day notice and proof of mailing (A.R.S. § 33-993).

No. Public property cannot be liened. On federal construction, contractors post payment bonds under the Miller Act (40 U.S.C. §§ 3131-3134), and unpaid subcontractors and suppliers claim against the bond. States have similar laws for their own projects, often called Little Miller Acts, with their own notice and suit deadlines.

Often, but homes get extra protection. In Arizona, no lien may be filed against an owner-occupant's dwelling unless the claimant signed a written contract directly with that owner (A.R.S. § 33-1002). In Texas a homestead lien needs a written contract signed before work began by the owner and spouse and then recorded, and the affidavit must carry a statutory notice at the top (Tex. Prop. Code § 53.254).

Still unsure? Visit the help center.

Ways to get your mechanic's lien

Answer the questions and preview the finished document free. You pay only when you’re ready to download, print or e-sign it, and you can choose how.

Free 7-day trial subscription Cancel anytime

$49/mo $0 for one week

Unlimited access to 210+ legal documents for 7 days. After the trial it renews at $49 a month unless you cancel at least 24 hours before it ends.

Start 7-day trial

Pro, billed yearly

$9.99/moBest value · Save 80%

Unlimited documents and edits, e-signature for every party, and the freedom to amend and re-issue at any time. Billed $119.88 a year and renews annually. Cancel anytime.

Start annual plan

Single document

$39One-time, no renewal

Unlock just this mechanic's lien: a permanent PDF download, printing, e-signature for every party and a tamper-evident audit trail, with no subscription.

Build this document

Prices in USD. Free blank templates stay free. Compare plans or read the refund policy.

Build your mechanic's lien in minutes

Preview the document your answers produce — then review, e-sign, or download it.

State-specific · E-sign ready · Legal form tools, not legal advice