Step 1 of 5 · Getting Started

Free Michigan Construction Lien Form

Your answers save as you go. Legal form tools, not legal advice.

Free template

Download a free mechanic's lien template

Free blank form—no account or payment required. The PDF is printable and the Word file is editable. This general version does not include state-specific clauses or disclosures.

Build a guided Michigan version
Real EstateLast updated November 12, 20264 min read

What is a Michigan mechanic's lien?

Michigan calls it a construction lien. The Construction Lien Act, MCL 570.1101 and following, lets unpaid contractors, subcontractors, suppliers and laborers claim a lien on the private property they improved. The recorded document is a claim of lien, and § 570.1111 gives its form.

Michigan’s system runs on paperwork tied to the owner’s notice of commencement: a notice of furnishing early on, a claim of lien within 90 days of your last work, service on the designee and a lawsuit within a year. Public projects do not use liens; claimants there rely on payment bonds.

Michigan construction lien rules

Michigan claim of lien at a glance

TopicRuleSource
DocumentClaim of lien, in the statutory formMCL 570.1111(2)
Notice of furnishingSubcontractors and suppliers, within 20 days of first furnishing; contractors exemptMCL 570.1109(1)
Recording deadlineWithin 90 days after the claimant’s last furnishingMCL 570.1111(1)
VerificationSworn statement subscribed before a notaryMCL 570.1111(2)
ServiceOn the designee within 15 days after recording, in person or certified mailMCL 570.1111(5)
Suit to enforceWithin 1 year after recordingMCL 570.1117(1)

The recording deadline

The 90 days run from your own last furnishing of labor or material, and the clock is the same whether you hired on with the owner or with another contractor. Count from the last day you did contract work or delivered materials for the job, and record well before day 90.

Notices before and after recording

The owner’s notice of commencement names a designee. Subcontractors and suppliers send their notice of furnishing within 20 days of first furnishing. Laborers have their own notice deadlines tied to when wages or fringe benefits came due.

After recording, serve the designee within 15 days. If the notice of commencement named no designee, serve the owner or lessee it names. Keep the proof of service; it must be attached to any complaint to enforce the lien.

How LawVault handles Michigan

LawVault’s builder prepares a claim of lien for Michigan. It asks for:

  • Your role: contractor hired by the owner, subcontractor, supplier or worker
  • Your legal name, address and any license number
  • The owner from the land records, the street address, county, parcel number and legal description
  • Who hired you, the original contractor, the contract, what you furnished, your first and last dates of work and the amount after credits
  • The date of your notice of furnishing, if you sent one

The finished document has a sworn verification with a notary jurat, a proof of service page for the copy you serve on the designee, and a guidance page that reminds you to confirm the recording deadline before you record. Count the 90 days from your last furnishing yourself. The claim is printed and signed in ink, not e-signed. LawVault does not check whether you have lien rights or whether you are on time, and it never promises that a lien is valid.

Deadlines decide everything

Missing a Michigan deadline loses the lien. LawVault is a document service, not a law firm, and this page is not legal advice. For a residential job or a disputed claim, speak with a Michigan construction attorney.

How to file a Michigan construction lien

  1. Get the notice of commencementFind the designee and owner named in the owner’s notice of commencement.
  2. Check your notice of furnishingSubcontractors and suppliers confirm the notice went out within 20 days of first furnishing.
  3. Build the claimEnter the owner, legal description, hiring party, work, dates and amount owed.
  4. Sign before a notaryPrint the claim and sign the sworn statement in front of a notary.
  5. Record and serveRecord with the register of deeds within 90 days, then serve the designee within 15 days.
  6. Sue within one yearFile an action to enforce the lien within one year after recording.

This page reflects the Michigan Construction Lien Act as of November 2026.

Common questions

Within 90 days after your last furnishing of labor or material for the improvement (MCL 570.1111(1)). The same 90 days applies to contractors, subcontractors, suppliers and laborers.

Subcontractors and suppliers give a notice of furnishing within 20 days after first furnishing (MCL 570.1109). A contractor with a direct contract with the owner does not. A late notice usually still keeps the lien, but not for amounts the owner already paid in reliance on a sworn statement or waiver.

Yes. Section 570.1111(2) gives the form of the claim, and it ends with a sworn statement subscribed before a notary public.

Within 15 days after recording, serve a copy of the claim of lien on the designee named in the notice of commencement, personally or by certified mail with return receipt. If no designee was named, serve the owner or lessee named in that notice (MCL 570.1111(5)).

An action to enforce the lien must be filed no later than one year after the claim of lien was recorded (MCL 570.1117(1)). Attach your proof of service on the designee to the complaint.

Yes. The PDF and Word files are free to download without an account. The PDF is a printable blank, not a fillable form; use the Word file or the guided builder to type your terms.

Still unsure? Visit the help center.

Ways to get your mechanic's lien

Answer the questions and preview the finished document free. You pay only when you’re ready to download, print or e-sign it, and you can choose how.

Free 7-day trial subscription Cancel anytime

$49/mo $0 for one week

Unlimited access to 210+ legal documents for 7 days. After the trial it renews at $49 a month unless you cancel at least 24 hours before it ends.

Start 7-day trial

Pro, billed yearly

$9.99/moBest value · Save 80%

Unlimited documents and edits, e-signature for every party, and the freedom to amend and re-issue at any time. Billed $119.88 a year and renews annually. Cancel anytime.

Start annual plan

Single document

$39One-time, no renewal

Unlock just this mechanic's lien: a permanent PDF download, printing, e-signature for every party and a tamper-evident audit trail, with no subscription.

Build this document

Prices in USD. Free blank templates stay free. Compare plans or read the refund policy.

Build your mechanic's lien in minutes

Preview the document your answers produce — then review, e-sign, or download it.

State-specific · E-sign ready · Legal form tools, not legal advice