What is a Minnesota mechanic's lien?
Chapter 514 of the Minnesota Statutes lets contractors, subcontractors, suppliers and laborers who improve private real estate claim a lien when they are not paid. The lien arises from the work, but it ends after 120 days unless the claimant records a statement of the claim and serves the owner.
Minnesota leans hard on early notice. On homes and small residential buildings, a contractor who skips the prelien notice loses the lien entirely. Public projects are outside the lien system; claimants there rely on payment bonds.
Minnesota mechanic's lien rules
Minnesota mechanic's lien at a glance
| Topic | Rule | Source |
|---|---|---|
| Document | Statement of the claim (mechanic’s lien statement) | Minn. Stat. § 514.08 |
| Contractor prelien notice | In the written contract, or within 10 days after the work is agreed on | Minn. Stat. § 514.011, subd. 1 |
| Subcontractor notice | To the owner within 45 days after first furnishing | Minn. Stat. § 514.011, subd. 2 |
| Recording and service | Record and serve the owner within 120 days after the last work | Minn. Stat. § 514.08 |
| Verification | Verified by the oath of a person who knows the facts | Minn. Stat. § 514.08 |
| Where to record | County recorder, or registrar of titles for registered land | Minn. Stat. § 514.08 |
| Suit to enforce | Within 1 year after the last item in the lien statement | Minn. Stat. § 514.12, subd. 3 |
The 120-day deadline
Minnesota counts 120 days from the last of your work or your last delivery of materials. Both steps must happen inside that window: recording the statement and serving a copy on the owner. Service is personal or by certified mail, and it can go to the owner’s authorized agent or to the person who hired the contractor.
Prelien notice and residential work
The prelien notice protects owners of homes and small residential buildings. A contractor working for the owner puts the notice in the written contract, in at least 10-point bold type or capital letters. A subcontractor or supplier sends its own notice to the owner within 45 days of first furnishing. Good-faith efforts to comply can save a subcontractor’s lien unless the owner shows harm from the failure.
How LawVault handles Minnesota
LawVault’s builder prepares a Minnesota mechanic’s lien statement. It asks for:
- Your role: contractor hired by the owner, subcontractor, supplier or worker
- Your legal name, address and any license number
- The owner from the land records, the street address, county, parcel number and legal description, and what kind of building it is
- Who hired you, the original contractor, the contract, what you furnished, your first and last dates of work and the amount after credits
- The date of your prelien notice, if the project needed one
The finished document has a sworn verification with a notary jurat, a proof of service page for the copy you serve on the owner, and a guidance page with Minnesota’s deadline. For a contractor hired by the owner, the guidance page estimates the 120-day date from your last furnishing date. Service on the owner must also happen by that date. The statement is printed and signed in ink, not e-signed. LawVault does not check whether you have lien rights or whether you are on time, and it never promises that a lien is valid.
Missing a Minnesota deadline or a required prelien notice loses the lien. LawVault is a document service, not a law firm, and this page is not legal advice. For a home project or a disputed claim, talk with a Minnesota construction attorney.
How to file a Minnesota mechanic’s lien
- Check the prelien noticeConfirm the contract notice or your 45-day subcontractor notice was given, if the project needed one.
- Find your last work dateUse the last day you worked or delivered materials and count 120 days.
- Build the statementEnter the owner, legal description, hiring party, work, dates and amount owed.
- Verify under oathPrint the statement and sign the oath, usually before a notary.
- Record and serveRecord with the county recorder or registrar of titles and serve the owner, all within 120 days.
- Sue within one yearStart the foreclosure action within one year after the last item in your statement.
This page reflects the Minnesota Statutes as of November 2026.
Common questions
The lien ends 120 days after you did the last of the work or furnished the last materials unless, within that time, you record a lien statement and serve a copy on the owner (Minn. Stat. § 514.08). The same 120 days applies to contractors and subcontractors.
A contractor who contracts with the owner and will use subcontractors or suppliers must put the statutory notice in the written contract, or deliver it within 10 days after the work is agreed on. Subcontractors and suppliers without a contract with the owner give the owner written notice within 45 days after first furnishing (§ 514.011).
No. Section 514.011 exempts residential projects with more than four family units and certain nonresidential projects over 5,000 usable square feet, among other exemptions. Homes and small residential buildings of up to four units are covered.
Yes. The statement must be verified by the oath of a person who knows the facts (§ 514.08). Claimants usually sign it before a notary.
Within one year after the date of the last item of the claim as stated in the recorded lien statement (§ 514.12, subd. 3).
Yes. The PDF and Word files are free to download without an account. The PDF is a printable blank, not a fillable form; use the Word file or the guided builder to type your terms.
Still unsure? Visit the help center.
Ways to get your mechanic's lien
Answer the questions and preview the finished document free. You pay only when you’re ready to download, print or e-sign it, and you can choose how.
Free 7-day trial subscription Cancel anytime
$49/mo $0 for one week
Unlimited access to 210+ legal documents for 7 days. After the trial it renews at $49 a month unless you cancel at least 24 hours before it ends.
Start 7-day trialPro, billed yearly
$9.99/moBest value · Save 80%
Unlimited documents and edits, e-signature for every party, and the freedom to amend and re-issue at any time. Billed $119.88 a year and renews annually. Cancel anytime.
Start annual planSingle document
$39One-time, no renewal
Unlock just this mechanic's lien: a permanent PDF download, printing, e-signature for every party and a tamper-evident audit trail, with no subscription.
Build this documentPrices in USD. Free blank templates stay free. Compare plans or read the refund policy.